What are the working mode of the runner natural cooling scheme? (Multiple choice)
When the UPS2000-G shuts down the stand-alone system, which one of the following needs to be operated?
The default battery charge voltage of the UPS2000-G is ( ) V/cell.
Which of the following options is a natural cooling system?
DOD (depth of discharge) indicates the percentage of battery discharge and battery rated capacity.
Which part of the data center design is currently affecting its PUE?
() can realize the signal processing and centralized control of UPS5000-E.
When the NetCol5000-C commissions the drainage device, lift the high floater by hand for 5 seconds. At this time, the dual water pump is turned on at the same time, and the "discharge abnormality alarm" appears.
Check that the load switch is in the "OFF" position before powering up the URS5000.
What is the correct statement about the description of UPS5000-E? (Multiple choice)
The default password for the UPS2000-G-(6-20kVA) operator panel is ().
In the process of using the battery, in order to reduce the deterioration of the voltage imbalance between the batteries, it is necessary to increase the charging voltage of the battery pack, and to activate and charge the battery to extend the battery life, which is called ().
There is no limit to the total length of the direct expansion air-cooled air-conditioning refrigerant pipe.
When a fire occurs in the cabinet, what is used to activate the gas fire extinguishing device on site?