Which of the following statements regarding CDO-squared is correct?
I. CDO-squared use other CDOs and CMOs as collateral.
II. Risk assessment of CDO-squared is almost impossible due to their complexity.
III. CDO-squared have lower credit risk than CMOs but higher than CDOs.
To hedge a foreign exchange exposure on behalf of a client, a small regional bank seeks to enter into an offsetting foreign exchange transaction. It cannot access the large and liquid interbank market open primarily to larger banks. At which one of the following exchanges can the smaller bank trade the currency futures contracts?
I). The Tokyo Futures Exchange
II). The Euronext-Liffe Exchange
III). The Chicago Mercantile Exchange
SigmaBank has many branches that offer the same products and services. Which one of the four following statement presents an advantage of using RCSA questionnaire approach in the SigmaBank's operational risk framework?
Using a forward transaction, Omega Bank buys 100 metric tones of aluminum for delivery in six-months' time. However, after two months, the bank becomes concerned with the potential fluctuations in aluminum prices and wants to hedge its potential exposure against a possible decline in aluminum prices. Which one of the following four strategies could the bank use to offset the risk from its current exposure to aluminum as it sets the price for selling the commodity in four-months' time?
It is commonplace for the sellers of a single-name Credit Default Swap to post collateral to the buyer. What determines the amount of collateral posted?
When the cost of gold is $1,100 per bullion and the 3-month forward contract trades at $900, a commodity trader seeks out arbitrage opportunities in this relationship. To capitalize on any arbitrage opportunities, the trader could implement which one of the following four strategies?
AlphaBank's management is evaluating how changes in its business environment could materially impact risk categories. As a result, bank's management decides to implement the structure, which facilitates the discussion in an integrative context, spanning market, credit, and operational risk factors, and encourages transparency and communication between risk disciplines. Which one of the following four approaches should the management choose to achieve this strategic goal?
An options trader for a large institutional investor takes a long equity option position. Which of the following risks need to be considered when taking this position?
I. All the risks of underlying equities
II. Perceived volatility changes
III. Future dividends yields
IV. Risk-free interest rates
Which one of the following four statements represents a possible disadvantage of using total return swap to manage equity portfolio risks?
Why is economic capital across market, credit and operational risks simply added up to arrive at an estimate of aggregate economic capital in practice?
Which one of the following statements accurately describes market risk tolerance?
Which one of the following four options is NOT a typical component of a currency swap?
To improve the culture and awareness of the operational risk, Gamma Bank's CRO decides to promote three activities within her organization. Which one of the following four activities is NOT typically used to develop an operational risk framework?
Gamma Bank provides a $100,000 loan to Big Bath retail stores at 5% interest rate (paid annually). The loan is collateralized with $55,000. The loan also has an annual expected default rate of 2%, and loss given default at 50%. In this case, what will the bank's exposure at default (EAD) be?
Bank Omega is using futures contracts on a well capitalized exchange to hedge its market risk exposure.
Which of the following could be reasons that expose the bank to liquidity risk?
I. The bank may not be able to unwind the futures contracts before expiration.
II. Prices may move such that a loss results on the hedge.
III. Since futures require margins which are settled every day, the bank could find itself scrambling for funds.
IV. Exchange margin requirements could change unexpectedly.