최신Autodesk Certified Professional in BIM Management for Building Design - BIM_MGT_101무료샘플문제
The BIM manager on a large mixed-use development is leading the development of the project's information-delivery strategy. The client has strict handover requirements for both asset data and spatial coordination. The design schedule includes overlapping packages, and some task teams are unfamiliar with structured data exchanges.
What is the most appropriate approach to establish the project's information-delivery plans?
Refer to the exhibits.




A BIM manager is preparing a site model that includes three separate buildings. Which exhibit shows the correct way to assemble and position the individual building models on the site while maintaining proper coordinates and orientation?




A BIM manager is creating a firm-wide template for mobilization plans to outline the key steps, resources, and strategies required to set up and launch BIM operations at the beginning of projects.
Which two components should the template include to accomplish the goal? (Select two.)
For a project that is well into its Design Development phase, it is discovered that there is an easement on the property that increases the setback by 1 ft 6 in. (450 mm).
Which method for updating the geolocation of the project would be least disruptive to the extended design team?
Refer to the exhibits.


The firm's technical group would like to show demolished elements as dashed red in all future projects. The BIM manager is updating the Revit template to meet this new standard.
Which Phase Graphic Override will accomplish this?
A BIM manager is reviewing a consultant's architectural model before the next coordination milestone. The project requires each model to conform to a defined naming convention, include COBie parameters, and populate shared parameters according to the Model Element Table. The BIM manager notices that several elements are missing metadata and that some naming is inconsistent.
Which step best supports a systematic evaluation of completeness and compliance with project standards?