최신SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 - C-TSCM42-65무료샘플문제
What sequence do you follow in master data maintenance to define the production of a material?
The availability check during production order creation should use a different scope of check than during order release.
How can you fulfill this requirement?
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)
What does SAP ERP mean?
Which of the following functions does SAP Supply Chain Management (SCM) offer?
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
Which of the following statements about consumption are correct? (Choose two)