최신IBM Datacap V9.0 Solution Designer - C2070-994무료샘플문제
A customer has more than 500 document types that are to be processed by IBM datacap. Some of these documents will have 100+ fields.
Will the developer have to split this into multiple applications and why?
An IBM Datacap customer uses customized DotEdit panels in Datacap V8.0.1. They must now convert those panels to Datacap Desktop panels in Datacap V9.0.
Which file type should the DotEdit panels be converted to, in the process of converting them to Datacap Desktop panels?
In a client/server configuration, security encryption keys are imported to the computer where each of the Datacap components is installed and configured.
In which of the following Datacap components would the encryption key be created?
A developer has been tasked with exporting to a CVs file for a mainframe to ingest the field data from all the documents within a batch. The export must be used to set location and what level must this Rule be attached in the DCO?
What action must be used to set location and what level must this Rule be attached in the DCO?
A developer has created a new custom action using the IBM Datacap V9.0 and V9.0.1 custom action DDk.
Which of the following is required to install and use the custom action in datacap?
When copying an IBM Datacap application into a new production environment after testing, the application developer discovers that the application cannot connect to the repository.
Which file of the following files NOT copied by the Datacap Application Copy Tool, causing this and other errors related to UNC paths and connected strings?
A developer needs to manually execute the "OldBatches" task from the "Maint" application to remove batches in a "Job Done" status and verify results when complete.
What below tasks will need to be performed to achieve the objective?