최신SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing - C_TS422_2504무료샘플문제
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?
During production order creation several valid production versions are found. How does the system choose the production version?
You want to use capacity availability checks for production orders. Which settings have to be made for this?
Note: There are 2 correct answers to this question.
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
What is the difference between coproducts byproducts?Note: There are 2 correct answers to this question.
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.