최신Huawei HCIP-UC(Huawei Certified ICT Professional-Unified Communications) - H11-828-ENU무료샘플문제

문제1
An enterprise has deployed devices such as IP PBXs and eServers. The enterprise requires that the call records of employees (fewer than 50 persons) in a special position be traceable.
In consideration of costs, which of the following deployment modes is the most suitable?

정답: B
문제2
During software installation, you can first install the eServer and then the BMU and database.

정답: A
문제3
The console system must consist of (). (Multiple Choice)

정답: A,B,D
문제4
The AR router on a branch node is in local regeneration state. When user A on the PSTN dials the long number of user B on the AR router, the call connection fails.
Which of the following measures can be used to troubleshoot the fault? (Multiple Choice)

정답: A,B,D
문제5
You can collect logs on eSpace clients, including log files generated during client operation and system information.

정답: B
문제6
The eSpace UC solution supports the following multimedia conferencing functions (). (Multiple Choice)

정답: A,B,C,D,E
문제7
In a multi-node centralized network, which of the following statements are CORRECT if the central node is disconnected from a local node? (Multiple Choice)

정답: A,C,D
문제8
Users can log in to the BMU self-service page through eSpace Desktop to schedule conferences.

정답: B
문제9
In a multi-node centralized network, there is a central node with a U1981 deployed and a branch node with a U1911 deployed. SIP user A under U1911 calls an external FSTN user through the branch node's El trunk. After the call is connected, the path along which the RTP streams are transmitted is ().

정답: E
문제10
About the standby node configuration in the disaster recovery scenario, which of the following statements are CORRECT? (Multiple Choice)

정답: A,D
문제11
An enterprise has two U1981s working in active/standby mode for discover recovery, and the config modify switch waittime 10 command is executed on the standby device. One morning, the active device was faulty at 09:00, and recovered at 09:05. At this time, ().

정답: B
문제12
Before configuring a prefix of the local call attribute on a U1900 series unified gateway, the system
will ask you to configure a prefix of the national toll call attribute and a prefix of the international
toll call attribute.

정답: B
문제13
A U1960 gateway fails to be added on the BMU.
Which of the following are possible causes? (Multiple Choice)

정답: A,B,D

자격증의 중요성:

ITDumpsKR 경쟁율이 심한 IT시대에 인증시험을 패스함으로 IT업계 관련 직종에 종사하고자 하는 분들에게는 아주 큰 가산점이 될수 있고 자신만의 위치를 보장할수 있으며 더욱이는 한층 업된 삶을 누릴수 있을수도 있습니다.

ITDumpsKR 제품의 가치:

ITDumpsKR에는 IT인증시험의 최신 학습가이드가 있습니다. ITDumpsKR의 IT전문가들이 자신만의 경험과 끊임없는 노력으로 최고의 학습자료를 작성해 여러분들이 시험에서 패스하도록 도와드립니다.

무료샘플 받아보기:

관심있는 인증시험과목 덤프의 무료샘플을 원하신다면 덤프구매사이트의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아 덤프의 일부분 문제를 체험해 보실수 있습니다.

완벽한 서비스 제공:

ITDumpsKR는 한국어로 온라인상담과 메일상담을 받습니다. 덤프구매후 일년동안 무료 업데이트 서비스를 제공해드리며 구매일로 부터 60일내에 시험에서 떨어지는 경우 덤프비용 전액을 환불해드려 고객님의 부담을 덜어드립니다.