최신USGBC LEED AP Homes (Residential) - LEED-AP-Homes무료샘플문제

문제1
Minimum outdoor air ventilation in a LEED for Homes project is addressed by which of the following standards?

정답: A
설명: (ITDumpsKR 회원만 볼 수 있음)
문제2
After the HVAC contractor has completed the rough-in installation of all air handling equipment, what step should be taken to achieve Indoor Environmental Quality Credit, Contaminant Control during construction?

정답: B
설명: (ITDumpsKR 회원만 볼 수 있음)
문제3
The minimum required outdoor air ventilation is calculated based on the conditioned floor area of the home and the:

정답: D
설명: (ITDumpsKR 회원만 볼 수 있음)
문제4
For a two-bedroom unit in a multi-family building, a kitchen's minimum airflow requirement for intermittent local exhaust is:

정답: B
설명: (ITDumpsKR 회원만 볼 수 있음)
문제5
A project has a 2,500 ft² (232 m²) roof, 200 ft² (18.58 m²) uncovered patio, 100 ft² (9 m²) walkway, and 800 ft² (74 m²) driveway. The designer has selected ENERGY STAR qualified roofing material for 100% of the roof and open grid pavers (with 30% grass) for the patio and walkway. The driveway is gray concrete with an SR of 0.20. What is the percentage of non-absorptive hardscape material, rounded to the nearest whole number (if necessary)?

정답: D
설명: (ITDumpsKR 회원만 볼 수 있음)
문제6
What is the minimum number of required hours the project team must meet in order to earn the Integrative Process Credit, Option 2: Design Charrette?

정답: B
설명: (ITDumpsKR 회원만 볼 수 있음)
문제7
Which of the following strategies contributes to achieving Sustainable Sites Credit, Rainwater Management?

정답: D
설명: (ITDumpsKR 회원만 볼 수 있음)
문제8
What is the advantage of using native and adapted plant species instead of conventional turf?

정답: C
설명: (ITDumpsKR 회원만 볼 수 있음)
문제9
A project team for a home in a small town is pursuing LEED certification. The home is designed with the following site characteristics:
* The lot is square.
* Three sides of the square lot border undeveloped land.
* The previous home covering 78% of the lot is deconstructed and the new LEED home will be built in its place.
* One full side of the square lot borders a home that was built 10 years before the LEED project.
Compliance with which of the following options, if any, will qualify the home for Location and Transportation Credit, Site Selection?

정답: D
설명: (ITDumpsKR 회원만 볼 수 있음)
문제10
Introduction of outdoor air works to improve indoor air quality by:

정답: C
설명: (ITDumpsKR 회원만 볼 수 있음)

자격증의 중요성:

ITDumpsKR 경쟁율이 심한 IT시대에 인증시험을 패스함으로 IT업계 관련 직종에 종사하고자 하는 분들에게는 아주 큰 가산점이 될수 있고 자신만의 위치를 보장할수 있으며 더욱이는 한층 업된 삶을 누릴수 있을수도 있습니다.

ITDumpsKR 제품의 가치:

ITDumpsKR에는 IT인증시험의 최신 학습가이드가 있습니다. ITDumpsKR의 IT전문가들이 자신만의 경험과 끊임없는 노력으로 최고의 학습자료를 작성해 여러분들이 시험에서 패스하도록 도와드립니다.

무료샘플 받아보기:

관심있는 인증시험과목 덤프의 무료샘플을 원하신다면 덤프구매사이트의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아 덤프의 일부분 문제를 체험해 보실수 있습니다.

완벽한 서비스 제공:

ITDumpsKR는 한국어로 온라인상담과 메일상담을 받습니다. 덤프구매후 일년동안 무료 업데이트 서비스를 제공해드리며 구매일로 부터 60일내에 시험에서 떨어지는 경우 덤프비용 전액을 환불해드려 고객님의 부담을 덜어드립니다.